Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik > Daidalos Team discussions

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 02-22-2016, 03:48 AM
Spudkopf's Avatar
Spudkopf Spudkopf is offline
Approved Member
 
Join Date: Nov 2007
Location: Australia
Posts: 248
Default

Quote:
Originally Posted by _1SMV_Gitano View Post
Well, in principle it took a lot of material to build one of the big revetments. I read some where that it took somthing about many thousands of 5 gallon tanks to build a single revetment for Wellingtons in Malta!

It is perhaps better to stay low on polycount using simple shape and use the texture as a "proxy" to get the effect of many tanks.

Coming back to the previous model, here is a comparison between new and old:

picture

and how two revemetments can be combined:

picture
Due to server issues I cant see photobucket picture where I'm so sadly will have to wait until I get home to see the pictures.

I the meantime I did try a work the poly problem in my break time (with a very basic and loosely fitted skin)

__________________
Spud

Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 11:54 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.