Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover

IL-2 Sturmovik: Cliffs of Dover Latest instalment in the acclaimed IL-2 Sturmovik series from award-winning developer Maddox Games.

Reply
 
Thread Tools Display Modes
  #1  
Old 04-18-2012, 06:34 AM
41Sqn_Banks 41Sqn_Banks is offline
Approved Member
 
Join Date: Oct 2007
Posts: 644
Default

Quote:
Originally Posted by Sutts View Post
Does anyone know what maintenance/checks were required when a pilot returned an aircraft with the cutout wire broken? Was it just a check for metal in the oil perhaps....or a full tear down!?
http://www.spitfireperformance.com/dowding.pdf

Quote:
5. It is in the interest of the pilots themselves, when operations with the enemy may have resulted in engine limitations being exceeded, to acquiant the fact the maintenance personnel with the facts, so that [the] oil filters may be inspected at the first convenient opportunity to investigate whether damage to the bearings has resulted.
Reply With Quote
  #2  
Old 04-18-2012, 07:57 AM
Sutts Sutts is offline
Approved Member
 
Join Date: Jan 2010
Posts: 566
Default

Quote:
Originally Posted by 41Sqn_Banks View Post
Many thanks.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 12:47 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.