Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover

IL-2 Sturmovik: Cliffs of Dover Latest instalment in the acclaimed IL-2 Sturmovik series from award-winning developer Maddox Games.

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #7  
Old 06-25-2011, 08:19 PM
csThor csThor is offline
Approved Member
 
Join Date: Oct 2007
Location: somewhere in Germany
Posts: 1,213
Default

The E-7 is essentially a standardized version of the Emil which took all the modifications of the previous versions (most importantly those of the E-4) into the production process. The main difference was the installation of the necessary plumbing for a droptank (which the Emil could not use prior to the E-7) but apparently the droptanks weren't used before early 1941 (and therefor they're not relevant for the BoB).

Structurally neither the E-1 nor the E-3 nor the E-4 (or the E-7 for that matter) were different in any way. The difference which led to a different subseries was the wing armament - the E-1 used MG 17, the E-3 used MG FF and the E-4 used MG FF/M and in many many cases both earlier versions were reequipped with MG FF/M and therefor became E-4s. Any other details (such as the early and late type canopy and the armored headrest) cannot be used to discern the actual subversion.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:43 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.