Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads

Technical threads All discussions about technical issues

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #8  
Old 04-29-2012, 07:06 PM
Kodoss Kodoss is offline
Approved Member
 
Join Date: Aug 2011
Posts: 262
Default

Woahh, 2 months already gone... ok, a little update again.

Thinking about how to attach my wooden rings with my center disk put my a little bit in a problem. I would have had (is this even gramatically correct?! ) to mill the rings 2mm in the inside on 4 positions and to drill the 8 holes in 1 disk with its plates. The problem would have been: how to adjust all parts without a runout.

So I came up with another resolution. And it turns out to be even easier to realise.

I build 3 new center disks, this time a bit thicker, and bought 12 screws (M3x40mm).
In the disks I drilled 5 threads. 4 threads all 90° and 1 thread 45°.
PICT0025.JPG

The 45° thread goes to the core bore and will be used for securing the disk to the poti.
The other 4 threads will hold and adjust the ring to the center through the screws.

PICT0027.JPG

A little preview how it hopefully looks like. I still have to drill the holes for the ring. First with 3mm, then 5mm for the screwheads.
Also clear paint will be put onthe rings.

PICT0026.JPG

Last edited by Kodoss; 04-29-2012 at 07:09 PM.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 01:55 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.