Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 04-25-2012, 04:46 PM
winny winny is offline
Approved Member
 
Join Date: Sep 2009
Location: Manchester UK
Posts: 1,508
Default

Quote:
Originally Posted by Crumpp View Post
They did rush it!!'

If we take January 1942 as the time the conversion for Spitfire Mk I's was complete that represents about two years and four months between initial flight test and 100% ground operational adoption.
We don't..

Just found this. From the list of mkI serial numbers in M&S...

All spitfires built after the 1/6/1939 were Merlin III. Only 74 were Merlin II

On the 22nd March 1940 a letter from MAC ordered the change of production and specified that all MKI's were to have the Merlin X installed, starting from Serial Number R7023. This was to bring them upto MkIII standard. events overtook this instruction and from R7258 Merlin 45's were fitted, thus bringing the Mk I upto MkV spec. Why would they do this in march

R7023 was built on 28/1/1941 R7258 was completed on 5/4/1941

Every single spitfire produced after that date was a Merlin 45.

Simple fact is there were no operational mkI's around in 1942. Any that had survived that long were in OTU's all the others were converted to MkV's or PR's or whatever..
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 12:44 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.