Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik > Daidalos Team discussions

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #28  
Old 01-06-2012, 04:19 PM
stugumby stugumby is offline
Approved Member
 
Join Date: Jul 2010
Posts: 384
Default hmm thermal blow back issues indeed

I think they should check the langston valve for frictional delay. Then by using a micrometer to check for deviation in the fibre optic spectron alalyzer. You would think that if the oscillating rotors had adequate clearance, the friction modifiers would last longer. May have to break out the chiltons manual on this one, hmmm.

it may require tuning by Angus in salt lake, he fixed a friends drum set once!!
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 12:37 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.